When concrete was poured into the box, heat was liberated by the
hydration process, which increased the temperature of the concrete
mass. This temperature was monitored, at frequent intervals during the
first 24 hours and less frequent intervals thereafter, until the temperature
dropped close to the initial reading. The temperature was recorded for
upto 7days (168 hours) for all of the mixtures.