From site visit on 10 July 2014, the following are our comments on site work.
Please note that all below comments were only from our site walk, detail inspection shall remained to be by
site team PPS, we already talked with either PPS or Ritta during site walk for all comments above with
recommended remedial work.
Please PPS take care of instruction to CNT for all necessary rectification work.
Steel Fiber Slab
Following inspection, found cracks at grid line 15 and 15 next to GO docks, need Twintec to investigate and
rectify. Method statement shall be submitted prior.
Also at grid line 11' near Goods In, found sign of concrete breeding at top finished surface, need Twintec to
investigate and rectify. Method statement shall be submitted prior.