Based on field inspection/observations, it is my professional opinion that all work has been installed and is in substantial compliance with PW WMD Specifications, the approved Construction Drawings, and the
Grading Plan. The As-Built drawings included accurately depict the final installation of the storm drainage and/or sewer system.
Sincerely,