Since BEWB gas lift line project will required to erect scaffolding from BEPP-BEWA bridge during TPSD, I would propose for us to change the piping (replacement in kind) for this line as well ka. kindly help issue isometric drawing from flange to flange of this piping section ka. There is no isometric existing in Drawing library ka.