These are only the identified direct cost savings.
Potentially, much greater savings were achieved
through reduction in mistakes and reworks and by
avoiding unnecessary project delays. In the same
study, the company estimated these additional indirect
savings to be in the region of £300,000, which
is 6% of the overall project costs. They were able
to achieve this saving through the following means: