Peak hours: The activation and deactivation of A/C units is based on the total building load’s control and each floor’s temperature. In particular, the temperature sensors on each floor have been set to predefined maximum and minimum values through software and the end-user has not the ability to control them. Moreover, the total building load divided into four zones, as presented below: