4. PROJECTS WITH UNEQUAL LIVES Suppose a firm is considering two mutually exclusive projects, either a conveyor system (Project C) or a fleet of forklift trucks (Project F) for moving materials. The firm's cost of capital is 12%. The cash flow timelines are shown below, along with the NPV and IRR for each project.