Full use of available resources does not necessarily give the optimal solution, though. For example, if CM from a unit of x is $1 instead of $3, the optimal solution is at point B instead of point C: $1 (0) +$4 (24)=$96 of CM at point B, but only $1 (10) +$4(20)=$90 of CM at point C