1. If the Reactor vendor has been on site for the commissioning?
2. Why is the Hydraulic Drive Unit and Agitator still an issue in terms of the Electrical, Piping and Control Interface still an issue?
3. Why have M+W Commercial and Engineering not resolved this whole issue with the FMC preferred vendor?
4. What has been the FMC interference and or direct contact with the vendor?