2. Machine debugging
2.1 Safety check before debugging
You should firstly check whether the machine ground wire is connected or not before debugging and whether the connection of refrigeration water pipe is effective and then start machine to check to see whether each button is available and whether each structure is in good condition, each meter is normally displayed and to see whether there is water in refrigeration device and the grinding wheel is loose or not, if there is something particular, please press load intervention button. You can restart the machine after the malfunction is eliminated.
2.2 Adjustment connection and installment of grinding wheel before debugging the host, glass support, and Import transport guide should be horizontally adjusted before debugging, the relative position of Import transport guide and the host should also be adjusted.
1) The horizontal adjustment of the host
The horizontal adjustment of host is by adjusting bolt 1,,nut 2 and support plate to guarantee their horizon level.(see picture 6)
2) The horizontal adjustment of glass support by adjusting nut 1, bolt 2 and support plate “B “ to guarantee
Horizon level. After adjusting it well, use swelled bolt 3, nut 4 and opposite vertex 5 to fix it on the floor (see picture 7)
3) The horizontal adjustment of import guide rail.
The horizontal adjustment of import guide rail (that is the transmission guide
The transmission guide rail) is by adjusting bolt 7 to guarantee (see picture 7)
4) The adjustment of relative position of import guide rail and the host is
By adjusting nut 1 and nut 2 on the lead screw to guarantee (see picture 8)
Picture 6