in 2013 regulated that newly built power plants should consider the utilization ability of surrounding ash to prevent environmental pollution and avoid building permanent fly ash yard (dump) if it is actually needed, the siting, design, construction and operation management should conform to “Standard for pollution control on the storage and disposal site for general industrial solid wastes”(GB18599 - 2001)