Regarding to the SDT will handle to repair Toilet Pipe at the welfare building 1 (Cause of existing pipe leaking inside concrete wall)
Detail as below
Closing duration : Nov 7, 2015 – Dec 26, 2015.(Total 7 weeks)
Effect to : Can’t use service male toilet CM office
Purpose to : Repairing pipe inside concrete wall
Redundancy plan : Can use service toilet beside of Purchase Dept. area
Therefore the male toilet will be out of service from that time.
All gentlemen employee are requested to use toilet at Locker area or Partner’s toilet as below lay out.