Attached is your drawing L.35 / L.37 and KCC's scope of works.
- List key issue to remind on each area for reference.It was noted and agree that the kitchen works shall be devided into zones and its priorities.(see attached)
- Shop drawing L.35 / L.37
- Design drawing L.38 / L.39 ( by VPL except with KCC )