In total, three campaigns were planned; the first two were
successfully realised at a distance of 94 and 46 m ahead of the
longwall face. This two scanning campaigns were performed
in 14 days interval. Another one campaign planned in the
immediate proximity of the longwall face had to be cancelled
due to unfavourable conditions for scanning (significantly
reduced gate profile, high dustiness, high induced seismicity,
etc.).