Refer to attached Policy and Procedure.
2. Refer to attached Flow Chart.
3. Refer to attached Maintenance Request From.
4. Refer to copy of Work Request Board.
5. Assignment of work requests will be done by the
Chief Engineer, Assistant Chief Engineer or Duty
Engineer only.
6. All requests placed on the urgent hook will be
attended to within 10 minutes.
7. All backlog and waiting parts are to be completed
before assignment.
8. When removing a request from the Board, check if
there are any others in the same area and do these
at the same time to save two trips.
9. All uncompleted work request will be returned to
the back log hook every day.
10. All completed work request will be returned to the