14. An additional (third) guardrail should be installed above the normal guardrail on
underslung scaffold on offshore facilities. The vertical spacing to the third guardrail
shall be equal to the spacing between the mid and top guardrail.
15. Manually moved and power propelled scaffolds and elevating platforms shall not be
moved when occupied or with materials on the work platforms.