The final dewatering phase is the High Pressure Zone, where the highest allowable pressure for given sludge is applied. Pressing forces in this phase are generated by wrapping the belts, with the sludge sandwiched between them, around a series of rollers. Each roller creates a pressing force, squeezing out more water.