According to the required by PUR to sending the return part to overseas vendor
cause "Defective parts, Replacement" or other purpose.
To be keep schedule to ETD and meet your purpose to export.
Would you please cooperate with us to control export shipment smoothly.
The detail as following.-
1) Contact consignee (Receiver) by PUR to ensure other special conditions before export such as
- Schedule to ETD by approximate
- Ship mode
- Term of trade
- Special condition for replacement, or special required each country (if any)
2) Shipment arrangement
- Contact to PLC to packing by PUR as a direct export required.
- Draft export document for our processing with BOI (if any) in advance.
- Refer the item 1) mention above. Please let us know about vendor's nominate agent (if any).
If could not specify will be nominate by IMP
- Ensure the replacement condition before re-import the replacement.
3) IMP procedure with BOI for material under BOI privilege only.
- We will doing base on the information and document both item 1) and 2) are completely.
- By Air / Sea shipment . We can get approval by BOI within 7 working day after submit BOI date.
Special condition should be discuss case by case.
- Cooperate with shipping forwarder instead of PUR for shipment control smoothly.
Note : 1) The above process exclude Yearly SD procedure.
2) Material for Non-BOI please contact to PLC to export as a normal export shipment
Thank you in advance for your good cooperation.