During off season, electricity is supplied from 2x115 kV PEA grid system. For during milling season, the
plant generated electrical power itself as a cogeneration plant. The plant is equipped with three steam turbine
generators of 2x15 MW 3.3 kV KAWASAKI / TOYODENKI (to main production) and one 34 MW 11kV SHIN
NIPPON (to selling to EGAT under VSPP contract) Japan made steam turbine generators. Electrical inspection
and major maintenance are conducted annually before the milling season by in-house technicians and outsource
contractors.