When all siteworks have been completed the pipework should be flushed with oxygen free, high-pressure nitrogen to ensure that any moisture and debris are removed. All fittings should be kept to a minimum to reduce the number of joints (ie potential leaks) and frictional losses. Swept bends should be formed using a bending tool with the correct dies/mandrill /spring to prevent reeking or barreling.