This implies that there is a pumping penalty to increasing TEG power by way of an increase in flow rate and an increase in insert panel density. In considering the 0.1% uncertainty in the pressure gauges at the inlet and the outlet and considering an error due to a unit conversion, a resulting maximum error of 6.33% is present in the following pumping penalty results.