I asked both VL LSP and AF LSP, for suggestion from VL LSP, we need to return cargoes from VL LSP to our factory for SGS inspection(Third party inspection) before AF loading(This point was extra cost for transportation).
For updating Mercury System, we update every week before loading. Although , we updated after VL LSP informed to us, system didn’t changed anything.