CLARIFICATION OF THE FOLLOWING:
• High voltage level
• Power requirement
• Incoming overhead line(s)
• Short circuit level at point of supply, Max./Min
• Supply network: grounded or isolated
• Variations (%) in voltage and frequency
• Required power factor
• Required public metering facilities
• Local approvals