Modifications and adjustments
I. Piping mounting and the optical view (straight and in grid)
II. Electrical safety and protection
III. Noise reducers
IV. Protection fence
V. Paint
VI. Repair the damage on the tanks
VII. Light in top
VIII. Heater system
Show and represent
a. Make the whole system and area showable
b. Log lists
c. Safety and maintenance
d. Clean and dust
e. The automation of the valves need to be installed
f. The cover plate
g. The stickers and labeling
h. Color of the pipe to the international standard.
i. Remove corrosion and damage
ii. Clean the machine everyday
iii. Remove dust every day
i. Paint and make if presentable to customers and investors.
Most of the above should have been order and installed before 15 may 2015.
The modification before July 2015.