Contractor shall take good care during relocation/demolition of existing structure to minimize damages to the structure. Contractor shall not remove or relocate any facilities that can be a cause of disruption in plant operation prior to Employer/ Engineer approval. All reusable materials will be handed over to the Employer in accordance to Engineer instruction.