This specification gives the description of the vessel. It is the responsibility of the Builder to do detailed engineering. The Builder is free to propose changes to the basic design where other systems or solutions in his opinion would be better, after mutual agreement with the Owner. Any deviation from the above, due to local availability and/or standards, is allowed only when the deviation is minor or only after written approval by the Owner.