3.1. Waste flow allocation
When waste generation is deterministic, the waste flow allocation
problem is usually solved as a part of the more general
strategic planning models (see Section 2). Examples of such
papers, already described in the previous section, are those by
Bloemhof-Ruwaard et al. [12], Erkut et al. [25], Mitropoulos et al.
[17], and Ghiani et al. [10].