The idea of the shelving unit derived from the unused crane tracks, which demonstrated their carrying capacity before. The extra loading capacity is used to “hang” the new functions in the structure. The first unit, the intermediate floor with 1000 m² floor space, is accessed by an external staircase and elevator. These are connected to a system of gangways which lead to the several additional units.