For the normal flow conditions, all of the Austin and irrigation demands were met for all periods. The instream flow/ bay and estuary demands were met for 16 months, and for the remaining time, only the critical inflow was supplied. The supply and demand curve for the normal inflow conditions is shown in Figure 4.