Practically, the determined controls for risky works are monitored and measured by project leaders and the results are recorded on Onsite Safety Inspection Checklist (F-WHSE0301-02/Rev.01). Summary Monthly Report on compliance with the operation control is done by QSMS. These activities could be explained more in the Operation procedure “HSE Program and performance Measurement and Monitoring” (P-HSE-03; Rev.00; 05.11.2012).