5.0 Piping Insulation 5.1 Insulation Construction shall be performed a การแปล - 5.0 Piping Insulation 5.1 Insulation Construction shall be performed a ไทย วิธีการพูด

5.0 Piping Insulation 5.1 Insulatio

5.0 Piping Insulation
5.1 Insulation Construction shall be performed after all the insulation preparation have been finished and released.
5.2 Factory fabricated sectional pipe insulation shall be applied in staggered joint construction and secured with wire loops or bands on 225 mm centers. On multiple layer construction, all joints shall be lapped one-half of each section between layers. Each layer shall be secured separately. All joints shall be securely butted and all cracks, joints, etc. shall be filled with insulating sealant as appropriate.
5.3 Mastic sealer shall be used around pipe supports where the insulation is punctured by the support.
5.4 Heat traced lines shall be insulated to completely cover both line and tracing.
5.5 Where insulation is required on the outside of piping, vessels or equipment that extends through an exterior building wall or roof, the insulation shall not stop at the exterior of the building but shall be extended for 300 mm inside the building.
5.6 Any cracks or openings that occur in the insulation or weather-proofing are to be filled in with additional insulation or weather-proofing to provide a smooth sealed surface
5.7 At all flanges, unions, and pipe terminations, the pipe insulation shall be bevelled at a 45°angle to facilitate remove of flange bolts and union collars without damage to the main pipe insulation and metal jacketing. A screwed and sealed metal cover shall be installed.
5.8 All openings in metal jacketing for nipples, pipe supports, etc. are to be neatly cut to provide a tight fit and shall be thoroughly sealed and weather-proofed to prevent moisture from penetrating under the jacket. Openings shall be fitted with a metal collar or suitable flashing embedded in sealant and screwed firmly on place.
5.9 Insulation shall be covered with metal jacketing lapped a minimum of 50 mm on all seams and secured with screws and bands, locating one band at each lap joint and spaced a maximum of 450 mm on centre. Vertical jacketing shall be supported with “S” clips.
5.10 All insulation shall be clad with metal jacketing. Jacketing shall be installed so as to shed water and protect against wind and blowing rain.
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
5.0 Piping Insulation 5.1 Insulation Construction shall be performed after all the insulation preparation have been finished and released.5.2 Factory fabricated sectional pipe insulation shall be applied in staggered joint construction and secured with wire loops or bands on 225 mm centers. On multiple layer construction, all joints shall be lapped one-half of each section between layers. Each layer shall be secured separately. All joints shall be securely butted and all cracks, joints, etc. shall be filled with insulating sealant as appropriate.5.3 Mastic sealer shall be used around pipe supports where the insulation is punctured by the support.5.4 Heat traced lines shall be insulated to completely cover both line and tracing.5.5 Where insulation is required on the outside of piping, vessels or equipment that extends through an exterior building wall or roof, the insulation shall not stop at the exterior of the building but shall be extended for 300 mm inside the building.5.6 Any cracks or openings that occur in the insulation or weather-proofing are to be filled in with additional insulation or weather-proofing to provide a smooth sealed surface 5.7 At all flanges, unions, and pipe terminations, the pipe insulation shall be bevelled at a 45°angle to facilitate remove of flange bolts and union collars without damage to the main pipe insulation and metal jacketing. A screwed and sealed metal cover shall be installed.5.8 All openings in metal jacketing for nipples, pipe supports, etc. are to be neatly cut to provide a tight fit and shall be thoroughly sealed and weather-proofed to prevent moisture from penetrating under the jacket. Openings shall be fitted with a metal collar or suitable flashing embedded in sealant and screwed firmly on place.5.9 Insulation shall be covered with metal jacketing lapped a minimum of 50 mm on all seams and secured with screws and bands, locating one band at each lap joint and spaced a maximum of 450 mm on centre. Vertical jacketing shall be supported with “S” clips.5.10 All insulation shall be clad with metal jacketing. Jacketing shall be installed so as to shed water and protect against wind and blowing rain.
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!
ฉนวนกันความร้อนฉนวนกันความร้อนท่อ
5.0 5.1 การก่อสร้างจะสำเร็จ หลังจากทั้งหมดได้เสร็จสิ้นแล้วและฉนวนเตรียมปล่อยตัว
5.2 โรงงานประดิษฐ์ฉนวนท่อตัดจะถูกใช้ในการก่อสร้างร่วมโงนเงนและมีความปลอดภัยกับห่วงลวดหรือเชือก 225 มม. ศูนย์ ในการก่อสร้างหลายชั้น , ข้อต่อทั้งหมดจะซัดครึ่งหนึ่งของแต่ละส่วน ระหว่างชั้นแต่ละชั้นจะเป็นหลักประกันที่แยกต่างหาก ข้อต่อทั้งหมดจะปลอดภัยย่อและรอยแตก ข้อต่อ ฯลฯ จะเต็มไปด้วยวัสดุฉนวนที่เหมาะสม .
5.3 มาสติกซีลจะใช้รอบท่อสนับสนุนที่ฉนวนเจาะโดยการสนับสนุน .
5.4 ความร้อนสืบจะหุ้มฉนวนสายสมบูรณ์ครอบคลุมทั้งเส้นและการติดตาม .
55 ซึ่งเป็นฉนวนกันความร้อนที่ด้านนอกของท่อ , ภาชนะหรืออุปกรณ์ที่ขยายผ่านผนังภายนอกอาคารหรือหลังคา ฉนวนกันความร้อน จะไม่ได้หยุดอยู่ที่ด้านนอกของอาคาร แต่จะขยายไป 300 มม. ภายในอาคาร .
56 รอยแตกหรือช่องว่างที่เกิดขึ้นในฉนวนกันความร้อนหรืออากาศพิสูจน์อักษรจะเต็มไปด้วยอากาศพิสูจน์อักษรฉนวนเพิ่มเติม หรือเพื่อให้พื้นผิวที่ปิดผนึกเรียบ
5.7 เลยครีบ สหภาพ และ terminations ท่อ , ท่อฉนวนจะเป็นมุมเอียงที่มุม 45 องศาเพื่อความสะดวกในการกำจัดสลักเกลียวแปลนและสหภาพปกโดยไม่มีความเสียหาย กับท่อหลัก ฉนวนกันความร้อนและโลหะแจ็คเก็ต .เป็นเมาและครอบคลุมโลหะประทับตราจะติดตั้ง ทุกช่อง
5.8 โลหะแจ็คเก็ตสำหรับหัวนมท่อสนับสนุน ฯลฯ จะบรรจงตัดให้พอดีคับ และจะปิดสนิทอากาศอย่างละเอียดและรักษาความปลอดภัยเพื่อป้องกันความชื้นจากการเจาะใต้เสื้อ ช่องจะพอดีกับปลอกคอโลหะหรือกระพริบที่ฝังตัวอยู่ในหลุมและเมามั่นในสถานที่ที่เหมาะสม .
59 ฉนวนจะถูกปกคลุมด้วยแจ็คเก็ตโลหะซัดอย่างน้อย 50 มม. ทุกตะเข็บ และรักษาความปลอดภัยด้วยสกรูและวงดนตรี หาวงดนตรีหนึ่งในแต่ละรอบข้อต่อและระยะสูงสุด 450 มิลลิเมตร ในศูนย์ แจ็คเก็ตแนวตั้งจะได้รับการสนับสนุนด้วย " S "
5.10 คลิปทั้งหมดจะหุ้มฉนวนด้วยแจ็คเก็ตโลหะแจ็คเก็ตจะถูกติดตั้งเพื่อหลั่งน้ำและป้องกันลมและฝนพัด .
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.