with two partners,the Hawleys pooled their savings and bought equipment They began work on november 13, 1988. Many difficulties had to be overcome ground water rushed into the hole they dug, as did the muddy sides of the hole several pumps stopped the hole from filling up with water, the problem which had defeated previous salvage attempts.