Due to this, it is necessary to ensure a proper anchorage of the CFRP on un-cracked concrete beyond the outermost flexural crack position in ultimate limit state. The force developed by the CFRP in the section corresponding to the outermost crack (Nf,d) needs to be anchored to the available un-cracked concrete length (lb) (Fig. 2-15).