The MWA has remained committed to enhancing all aspects of ongoing water supply operations. There are pipe replacement projects to support an increase in water pressure by up to 10 meters to reduce electricity costs in water pumping and moderating water loss down to 20%, thus strengthening the stability in the production system. The MWA is also conducting a study for a new source of raw water in the Upper Chao Phraya River Basin in Chainat to support water usage for the next 100 years.