7. Pre-start security checks<br>A. Questions about the procedure or method<br>(1) The manner in which safety checks are carried out before the initiating of the change case is regulated by the Factory Modification Control (FIO-201).<br>Status of implementation<br>(1) Pre-test safety checks must be carried out in all cases, and the appropriateness and validity of the implementation of the left-mentioned project should be confirmed in detail. For example, Berol 048 test 04/02/2020, the introduction of a new chemical Polymer dispersant, completed in June before the start-up safety inspection, but the operator informed or trained to be performed but not recorded, and did not contain the hazard characteristics of the chemical and related treatments were not identified.<br>(2) If a problem item is found during the pre-test safety check, it will not be signed until the improvement is completed, and the results of the inspection will not be recorded.