THE PLAZA BUILDINGS
11) Cut out the hotel pieces. Set aside the roofs for the Twin Towers.
12) Fold over the roof section. Fold all tabs.
13) Fold the vertical facade, on the medium grey lines, to fit the roof. Make note that part of the inner facade juts out. Glue where necessary, use small amounts of white glue on tabs.
14) Glue the hotel to the plaza piece where indicated, again with white glue.
15) While the Marriott is drying, cut out the two larger pieces of 6WTC, the US Customs house.
16) The remaining grey rectangle is part of 6WTC's roof. To get the desired raised effect, use glue stick to attach a second sheet of card stock to the back of the box. Wait at least 5 minutes to dry.
17) Fold over the roof of the upper facade of 6WTC (the mostly grey part, the mostly white part is the bottom cover). Fold the bottom section in, then fold it back to stay out of the way.
18) Fold the walls, on the black lines to match the top. Glue to the top.
19) Glue the raised grey box piece to the roof.
20) When dry glue the bottom cover to the wall sections. Let dry
21) Follow the steps above for the bottom facade.
22) When both sections are dry, glue the lower facade to the bottom side of the upper facade.
23) Glue 6WTC to its respective place on the plaza piece. Let dry.
24) Carefully glue the plaza to the base. Make sure everything lines up, especially near the footprints of the Twin Towers.
25) Repeat steps 15-23 for 4WTC, this time gluing the building directly to the base.
26) Repeat again for 5WTC. Be careful and accurate. When building is complete, slide it straight down into its footprint.