CUEL HES contacting EMCO HES by walkie talkie to remove the timbers on the floor of the modular at B5PH but EMCO Piping Supervisor calling his HES to stand by at the area pipe lifting module B5PG and confirmed to refuse CUEL instruction / Advise to her refuse notify too