Khun Phipat ,
We are nearly at the end, this week I will neeed :
1) V14 pier schedule and reinforcement schedule as per spreadsheet. Send the dwg back to me with the xls link so that we can manage modifications in Paris.
2) V14 specific pier drawings as per the master file I sent before, not need to send pier type 2 , only type 3 and 4.
3) Last Pour of type 3/4/5 and 6 and diaphragm type 6:.
We have not submitted those as there are still some problems, we have submitted only the first and typical pours.
I am preparing everything and will send it to you.
For the diaphragm type 6, the comments will depend on the last pour drawing.
After these drawings are finished, everything should be finished unless we have some new types.
Erwan VICAT