Take note of attachments and the confirmed alignment of the 2 link bridges.There are 2 voids over link bridge 1 whereas link bridge to to Mall have no voids. The handrails are painted galvanized hollow section steel. The floor hardscape for pedestrian footpath will be our scope of works.