The Site Survey Report identifies, as part of the Engine Room survey, equipment essential to the correct operation of the
new MCS/RCS systems. The correct operation of this equipment could not be confirmed and through visual inspection
highlighted that their condition was questionable. This equipment is not in scope for this program but the performance
of the proposed MCS/RCS system could be adversely affected if they are found to be non-functional at the time of
installation/upgrade. The following recommendations are made: