This project was a study of the safety system management in the junk shop. The objective aimed to reduce the accident number and severity in Supon junk shop workplace at least 50%. The researcher had foreseen the problems of the workers redundant performance, thus domino theory, seven quality tools (7QC TOOL) have been used to improve the performance of workers for decrease the number of accidents in work.
The accident data was collected in six months with two periods, (1) before improvement plan during September 1st - November 30th 2015 and (2) after improvement plan during December 1st 2015 - February 29th 2016. In the first period, the number of accident was about 46 and accident severity was 71. The improvement plan was set in a worker procedure changing, equipment usage and safety training. The result shows that, after improvement plan, the number of accident fell from 46 reduced to 26 and accident severity also decreased to 32 and the decreasing rate was 54.93%
This project was a study of the safety system management in the junk shop. The objective aimed to reduce the accident number and severity in Supon junk shop workplace at least 50%. The researcher had foreseen the problems of the workers redundant performance, thus domino theory, seven quality tools (7QC TOOL) have been used to improve the performance of workers for decrease the number of accidents in work. The accident data was collected in six months with two periods, (1) before improvement plan during September 1st - November 30th 2015 and (2) after improvement plan during December 1st 2015 - February 29th 2016. In the first period, the number of accident was about 46 and accident severity was 71. The improvement plan was set in a worker procedure changing, equipment usage and safety training. The result shows that, after improvement plan, the number of accident fell from 46 reduced to 26 and accident severity also decreased to 32 and the decreasing rate was 54.93%
การแปล กรุณารอสักครู่..
