To improve the machinery and equipment to support production with supervisors . The plan to install the equipment of engineering standards set correctly. To analysis and define the specifications of the equipment and utilities and design improvements to the machinery by engineering assignment. To prepare to check the installation of an external service provider . Plan a test run of the equipment installation and equipment. Prepare to save the test and keep documents related to the equipment installed .