RPN values greater than these critical values (i.e., those that reside in the top right-hand quadrant of the scatter diagram) are captured in the shaded frame. Thus, in the case of Project A, risks RP-001, RP-002, RM-001, RM-002 and RM-003 reside inside the shaded circle frame and are hence categorised as the highest priority risks