Please see the answer below :
1. Elevator repair - The problem of the elevator is about
the electrical system. The technician inform us to change
R-ONE board and Switching powersupply board. They will
come to fix this problem on next monday (23 nov 2015).
2. Smell from sewer in lobby & hall ways - The problem is air conditioner drain pipe
and building drain pipe use the same way to drainage. The way to fix this problem is
to cleaning the air conditioner.
3. Increase common fee 2016 - Do you mean we charge 55 bath per Sq.M. and will chage
and extra later, right ?
For the committee elections for 2016 we will make it on the next annual general meeting(2016).
4 Follow up outstanding one off common fees - We on the process to sending the coorperation letter
to all the outstanding one.
Please note that the meeting is on the next saturday 28th Nov 2016.