They confirmation the Improve the electrical system (Annual) of power plant for the maintenance of all systems
on Sunday, September 7 from time 08.00-20.00 PM. , which in those days to stop
power supply, water supply, and the raw water.
If, we want a rent Generator can contact K.Pong by email.