Hi K.Orawan, Raymond,
Since there are 2 files you were referring, let me start with the 1st one (EG_SCG 4y). This proposed BOM (solution) is based on your input (requirements) that we discussed several months back, which both of us agreed that this is SCG’s “as-is” infrastructure to be converted to be HP Utility model under ES. If this is the case, I think we’ve gone through this so many times but might be with different ES persons. Is it possible if those who had gone through all the details with us can walk with Raymond first so he can catch up what is proposing and why?
If you were talking about the 2nd file (SAP CBM), I think you cannot refer to that since the file is too old. You should wait the final BOM based on your discussion with EG team last week. That should be the right configuration.
Jom krub,
Kindly prepare ES’s requirements based on this BOM (EG_SCG4y, not include SAP) as well as this solution design. It has been since March or April 15.