The introduction of electric traction to SRT represents a huge investment in modernizing the Thai Railway meter gauge network and will result in extensive modifications to the existing signalling infrastructure. This gives SRT to opportunity to upgrade their old existing principles to be in accordance with modern worldwide signalling practice.
Currently the Absolute Block, station to station, signalling system is used throughout SRT, including on the lines that are now planned to be electrified.