The feasibility study is performed with significant wave periods and heights where the peak probability density appears in the frequency distribution where the cumulative
frequency is 98.4% in the significant wave height less than H1/3=2.25 m. In the wave condition, the best turbine diameter is selected between 2 m and 2.5 m.