into account, when modeling logistic activities with sufficient accuracy. The chosen model enables in an
easy way to simulate construction, especially outfitting processes with several different characteristics.
The adaptation of the model to a special construction site should be possible without programming
(Voigtmann et al, 2008). The dimensioning of the site equipment elements and the structuring of the logistic
organization is done in a simple way. Table 2 shows the most important input data (characteristics
of construction processes, site, material and logistic strategies and organizational structure) to simulate
logistic activities on site.