After the start-up and first cycle the plan in the design is that the reclaim booster empty the vessel that has processed the rice under 50 BarG and boost this in to the vessel with the new load of rice. The missing pressure would be topped u from the now called Red tank and t the booster that are connected to the Nitrogen Generator. And this cycle would repeat itself every time.
Beware that there are still missing pats to meet the original design. Parts like the reclaim booster that supposed to transport the processing gas volume from one tank to another tank. This reclaim booster that would have to empty one tank in to another is the missing. We have the booster that has to top up the pressure.
In the current state we are using the top up booster to do both top up and also make the volume that the reclaim booster should have done. The decision not to have parts installed in January 2015 are made by URMATT in November 2014. Told to me was that these missing part would become available after the installation of the two vessel and that system would run on 24 BarG till then.
URMATT innovation vehicle would be made and this would be finished the vessel would belong to the new URMATT Innovation vehicle.
I do hope this explains a lot to you.